Power / connected load vis-à-vis requirement
 
The Institute has got permission from the Central Electricity Supply Unit (CESU) to consume power to the extent of 100 KW. Accordingly in the Institute there is a transformer sub-station of 11/0.4 KV is in operation. The average load consumed in the Institute is 54 KW in total.